Skip to content
MY Caipirinha — photograph

M/Y Caipirinha

60m Lurssen · Croatia, Adria docks shipyard

Scope of works

  • Sandblasting and painting of 5 tanks
  • Sanding and painting of chain lockers
  • Design, production and installation of bitter end release in chain lockers.
  • Complete overhaul of Reintjes gearboxes and installation of new gearbox housings.
  • Dismantle and inspection of Rolls Royce steering system.
  • Overhaul of Quantum stabilisers
  • Overhaul of Jastram bow thruster
  • Top End overhaul on 3 pcs CAT C18 gensets
  • Extensive AC and refrigeration system service
  • Installation of two new SAUER compressors
  • Overhaul of ER ventilation system
  • Cleaning of ventilation, galley and laundry ducting
  • Extensive service of ASEA units
  • Annual FF and LSA certification
  • Replacement of teak on transom platform
  • Production and installation of new tender bumper fixing points on swim platform.
  • Production of new teak steps with integrated optic fibre lighting system.
  • Repair and revarnishing of all exterior table tops.
  • Replacement of upholstery, carpets and flooring in crew area
  • Retiling of crew cabin bathrooms
  • Installation of new Transas dual ECDIS platinum system
  • Service and maintenance works on all tenders and jet-skies
  • 10 year class renewal, Lloyd register
  • Ultra high pressure water jetting of bottom and application of new AF system
  • Overhaul of all underwater valves
  • Cleaning of 19 tanks

The vessel

Build
60m Lurssen
Length
60 m
Year
2018
Yard
Croatia, Adria docks shipyard
Service
Painting
Service
Interior

Similar projects

Next projectM/Y Waverunner43m Palmer Johnson · 2018

Plan your project

Send the vessel, the window and the scope.

Phone
  • ISO 9001 · 14001 · 45001
  • Since 2008
  • 120+ projects per year
Call